{"schema_version":"1.0","canonical_url":"https://patentable.app/patents/US-10509687","patent":{"patent_number":"US-10509687","title":"Process migration in data center networks","assignee":null,"inventors":[],"filing_date":"2017-02-28T00:00:00.000Z","publication_date":"2019-12-17T00:00:00.000Z","cpc_codes":["G06F","G06F"],"num_claims":19,"abstract":"There is provided a method and system for process migration in a data center network. The method includes selecting processes to be migrated from a number of overloaded servers within a data center network based on an overload status of each overloaded server. Additionally, the method includes selecting, for each selected process, one of a number of underloaded servers to which to migrate the selected process based on an underload status of each underloaded server, and based on a parameter of a network component by which the selected process is to be migrated. The method also includes migrating each selected process to the selected underloaded server such that a migration finishes within a specified budget."},"analysis":{"summary":null,"layman_explanation":null,"technical_analysis":null,"business_analysis":null,"faqs":null,"topics":[],"tech_cluster":null},"seo":{"title":"Process migration in data center networks","description":"There is provided a method and system for process migration in a data center network. The method includes selecting processes to be migrated from a number of overloaded servers within a data center ne","keywords":[]},"attribution":{"source":"Patentable","source_url":"https://patentable.app","canonical_url":"https://patentable.app/patents/US-10509687","license":"CC-BY-4.0-like","license_terms":"AI-generated analysis on this page (summary, layman_explanation, technical_analysis, business_analysis, faqs) may be reused with attribution and a visible link back to the canonical URL above. Patent abstracts, claims, and bibliographic data are USPTO public domain.","required_link":"https://patentable.app/patents/US-10509687","citation_suggestion":"Patentable. \"Process migration in data center networks\" (US-10509687). https://patentable.app/patents/US-10509687","copyright_holder":"Nomic Interactive Technology LLC"},"links":{"html":"https://patentable.app/patents/US-10509687","json":"https://patentable.app/api/llm-context/US-10509687","site":"https://patentable.app","llms_txt":"https://patentable.app/llms.txt"},"generated_at":"2026-05-30T09:24:12.995Z"}