Patentable/Patents/US-10693371
US-10693371

Method and apparatus for peak switching to reduce losses in high frequency DC-DC converters

PublishedJune 23, 2020
Assigneenot available in USPTO data we have
Inventorsnot available in USPTO data we have
Technical Abstract

A method includes monitoring a resonant interval across a switching node. The method also includes detecting one or more preset values associated with the resonant interval across the switching node. The method further includes, in response to detecting the one or more preset values associated with the resonant interval across the switching node, initiating a high switch into an “on” operation.

Patent Claims
16 claims

Legal claims defining the scope of protection, as filed with the USPTO.

1

1. A method comprising: monitoring a first resonant interval and a second resonant interval across a switching node; detecting a first resonant peak associated with the first resonant interval, and a second resonant interval associated with the second resonant interval across the switching node; and in response to detecting each of the first resonant peak and the second resonant peak, initiating a high switch into an “on” operation, wherein a percentage of time of the high switch in the “on” operation is different with respect to the first resonant peak and the second resonant peak.

2

2. The method of claim 1 , wherein the first resonant peak and the second resonant peak are one of voltage values and derivatives of voltage values.

3

3. The method of claim 1 , wherein the high switch is initiated into the “on” operation after detecting the first resonant peak or the second resonant peak at least twice.

4

4. The method of claim 1 , further comprising initiating the high switch into an “off” operation after initiating the high switch into the “on” operation.

5

5. The method of claim 1 , wherein initiating the high switch into the “on” operation comprises initiating the high switch into the “on” operation in response to detecting that the first resonant peak or the second resonant peak is approaching a maximum.

6

6. The method of claim 1 , wherein the high switch is initiated into the “on” operation after a predetermined time.

7

7. The method of claim 1 , wherein said monitoring includes monitoring a sequence of first resonant intervals and a sequence of second resonant intervals across the switching node and selectively ignoring some resonant intervals of each of the sequence, and wherein initiating the high switch into the “on” operation comprises initiating the high switch into the “on” operation during each resonant interval next following each ignored resonant interval.

8

8. The method of claim 4 , further comprising initiating a low switch into an “on” operation while initiating the high switch into the “off” operation.

9

9. An apparatus comprising: a buck converter configured to be coupled to a power supply, the buck converter comprising a switching node, a first transistor, and a second transistor; and a controller configured to: monitor a resonant interval across the switching node, detect a resonant peak associated with the resonant interval across the switching node, and in response to detecting the resonant peak, initiating the first transistor into an “on” operation, wherein the first transistor remains in the “on” operation for a time duration that is less than the time duration of the resonant peak.

10

10. The apparatus of claim 9 , wherein the resonant peak is one of voltage values and derivatives of voltage values.

11

11. The apparatus of claim 9 , wherein the controller is configured to initiate the first transistor into the “on” operation after detecting the resonant peak at least twice.

12

12. The apparatus of claim 9 , wherein the controller is further configured to initiate the first transistor into an “off” operation and initiate the second transistor into an “on” operation.

13

13. The apparatus of claim 9 , wherein the controller is further configured to initiate the second transistor into an “off” operation.

14

14. The apparatus of claim 9 , wherein the controller is configured to initiate the first transistor into the “on” operation in response to detecting that the resonant peak is approaching its maximum value.

15

15. The apparatus of claim 9 , wherein the controller is configured to initiate the first transistor into the “on” operation after a predetermined time.

16

16. The apparatus of claim 9 , wherein said controller is configured to monitor a sequence of resonant intervals across the switching node and selectively ignore some resonant intervals of the sequence, and wherein the controller is configured to initiate the first transistor into the “on” operation during each resonant interval next following each ignored resonant interval.

Classification Codes (CPC)

Cooperative Patent Classification codes for this invention. Click any code to explore related patents in that topic.

Patent Metadata

Filing Date

July 31, 2014

Publication Date

June 23, 2020

Want to explore more patents?

Browse 5M+ US patents with plain-English claim translations and AI-generated analysis.

Citation & reuse

Analysis on this page is generated by Patentable — an AI-powered patent intelligence platform. AI-generated summaries, explanations, and analysis may be reused with attribution and a visible link back to the canonical URL below. Patent abstracts and claims are USPTO public domain.

Cite as: Patentable. “Method and apparatus for peak switching to reduce losses in high frequency DC-DC converters” (US-10693371). https://patentable.app/patents/US-10693371

© 2026 Patentable. All rights reserved.

Patentable is a research and drafting-assistant tool, not a law firm, and does not provide legal advice. Documents we generate are drafts for review by a licensed patent attorney.