Patentable/Patents/US-11416796
US-11416796

Control system for generating and distributing energy resources and operating building equipment accounting for resource provider contraints

PublishedAugust 16, 2022
Assigneenot available in USPTO data we have
Inventorsnot available in USPTO data we have
Technical Abstract

A method for controlling an energy production and distribution system includes identifying sources that supply input resources, subplants that produce output resources using the input resources, and sinks that consume the output resources. The method includes obtaining a cost function including a cost of producing the output resources and generating a transit time constraint that requires the input resources be sent from the sources to the subplants at a first departure time that occurs before a first arrival time at which the input resources are predicted to be used by the subplants. The method includes solving an optimization problem to determine an amount of the output resources to produce at each of multiple time steps within a time period. Solving the optimization problem includes performing an optimization of the cost function subject to the transit time constraint.

Patent Claims
6 claims

Legal claims defining the scope of protection, as filed with the USPTO.

2

2. The method of claim 1, wherein the input resources comprise raw resources and the one or more subplants comprise one or more raw resource subplants configured to convert the raw resources to refined resources and one or more refined resource subplants configured to convert the refined resources to the output resources.

6

6. The method of claim 1, wherein the cost function comprises a cost of converting one or more of the input resources to one or more of the output resources for each of the subplants.

7

7. The method of claim 1, wherein the cost function comprises a cost of transporting the output resources from the subplants to the sinks based on geographic locations of the subplants and the sinks.

10

10. The controller of claim 9, wherein the one or more subplants comprise one or more raw resources subplants configured to convert raw resources to refined resources and one or more refined resource subplants configured to convert the refined resources to the output resources.

14

14. The controller of claim 9, wherein the cost function comprises a cost of converting one or more of the input resources to one or more of the output resources for each of the subplants.

15

15. The controller of claim 14, wherein the cost function comprises a cost of transporting the output resources from the subplants to the sinks based on a geographic location of the subplants and the sinks.

Classification Codes (CPC)

Cooperative Patent Classification codes for this invention. Click any code to explore related patents in that topic.

Patent Metadata

Filing Date

April 28, 2020

Publication Date

August 16, 2022

Want to explore more patents?

Browse 5M+ US patents with plain-English claim translations and AI-generated analysis.

Citation & reuse

Analysis on this page is generated by Patentable — an AI-powered patent intelligence platform. AI-generated summaries, explanations, and analysis may be reused with attribution and a visible link back to the canonical URL below. Patent abstracts and claims are USPTO public domain.

Cite as: Patentable. “Control system for generating and distributing energy resources and operating building equipment accounting for resource provider contraints” (US-11416796). https://patentable.app/patents/US-11416796

© 2026 Patentable. All rights reserved.

Patentable is a research and drafting-assistant tool, not a law firm, and does not provide legal advice. Documents we generate are drafts for review by a licensed patent attorney.