An apparatus for optimizing control parameters of a power plant is provided. The apparatus for optimizing control parameters of a power plant includes: a model generator configured to configure a forecast model including a process model and a control model, a model corrector configured to correct a first parameter of the process model through operation data of a real power plant, and a tuner configured to tune a second parameter, which is a parameter related to a time delay of the forecast model, so as to have a target load increase rate.
Legal claims defining the scope of protection, as filed with the USPTO.
Claim text for this patent isn't available yet.
Cooperative Patent Classification codes for this invention. Click any code to explore related patents in that topic.
December 23, 2020
September 20, 2022
Browse 5M+ US patents with plain-English claim translations and AI-generated analysis.