Patentable/Patents/US-20250316969-A1
US-20250316969-A1

Automated Vegetation Management System

PublishedOctober 9, 2025
Assigneenot available in USPTO data we have
Inventorsnot available in USPTO data we have
Technical Abstract

A vegetation management system includes a computing system including a processor having an associated memory that is configured for implementing a vegetative modeler including an image analyzer and at least one 3-dimensional (3D) vegetation growth model. The vegetative modeler is for analyzing images of vegetation that is growing around electrical power lines of an electric utility including identifying locations of the vegetation relative to locations of the electrical power lines and to identify specific types of the vegetation. The 3D vegetation growth model utilizes at least the locations of the vegetation relative to the locations of the electrical power lines and the specific types of the vegetation to generate a predicted timing of encroachment of the electrical power lines by the vegetation to identify future encroachment areas. A scheduler is for scheduling vegetative maintenance of the vegetation for the future encroachment areas.

Patent Claims

Legal claims defining the scope of protection, as filed with the USPTO.

1

. A computing device comprising:

2

. The computing device of, wherein the one or more images of the area comprises at least one of a satellite imagery, unmanned aerial vehicle (UAV) imagery, drone inspection footage, mobile laser-derived imagery, and camera-derived photographs.

3

. The computing device of, wherein the vegetation growth model analyzes the one or more images to at least identify the one or more first locations of the vegetation in the proximity of the electric utility and the type of vegetation at the one or more first locations of the electric utility.

4

. The computing device of, wherein the vegetation growth model includes at least one regional model and 3D vegetation model.

5

. The computing device of, wherein the vegetation growth model utilizes the one or more first locations of the vegetation and the type of the vegetation in each of the one or more first locations to predict a timing of a future encroachment of the electric utility by the vegetation.

6

. The computing device of, wherein the vegetation at the one or more second locations are numerically scored based on the timing of the future encroachment of the electric utility by the vegetation.

7

. The computing device of, wherein the numerically scored one or more tasks are ranked in order of priority of performing maintenance around the one or more second locations.

8

. The computing device of, wherein the one or more tasks at least comprises of pruning trees, cut underbrush and spray herbicides on the vegetation on the one or more second locations.

9

. A method, comprising:

10

. The method of, wherein the one or more images of the area comprises at least one of a satellite imagery, unmanned aerial vehicle (UAV) imagery, drone inspection footage, mobile laser-derived imagery, and camera-derived photographs.

11

. The method of, wherein the vegetation growth model analyzes the one or more images to at least identify the one or more first locations of the electric utility and the type of vegetation at the one or more first locations of the electric utility.

12

. The method of, wherein the vegetation growth model includes at least one regional model and 3D vegetation model.

13

. The method of, wherein the vegetation growth model utilizes the one or more first locations of the vegetation and the type of the vegetation in each of the one or more first locations to predict a timing of a future encroachment of the electric utility by the vegetation.

14

. The method of, wherein the vegetation at the one or more second locations are numerically scored based on the timing of the future encroachment of the electric utility by the vegetation.

15

. The method of, wherein the numerically scored one or more tasks are ranked in order of priority of performing maintenance around the one or more second locations.

16

. A non-transitory computer readable medium containing instruction that when executed by at least one processing device cause at least one processing device to:

17

. The non-transitory computer readable medium of, wherein the one or more images of the area comprises at least one of a satellite imagery, unmanned aerial vehicle (UAV) imagery, drone inspection footage, mobile laser-derived imagery, and camera-derived photographs.

18

. The non-transitory computer readable medium of, wherein the vegetation growth model analyzes the one or more images to at least identify the one or more first locations of the electric utility and the type of vegetation at the one or more first locations of the electric utility.

19

. The non-transitory computer readable medium of, wherein the vegetation growth model includes at least one regional model and 3D vegetation model.

20

. The non-transitory computer readable medium of, wherein the vegetation growth model utilizes the one or more first locations of the vegetation and the type of the vegetation in each of the one or more first locations to predict a timing of a future encroachment of the electric utility by the vegetation.

21

. The non-transitory computer readable medium of, wherein the vegetation at the one or more second locations are numerically scored based on the timing of the future encroachment of the electric utility by the vegetation.

22

. The non-transitory computer readable medium of, wherein the numerically scored one or more tasks are ranked in order of priority of performing maintenance around the one or more second locations.

Detailed Description

Complete technical specification and implementation details from the patent document.

This application is a continuation of U.S. Ser. No. 18/645,515; filed Apr. 25, 2024, entitled, “AUTOMATED VEGETATION MANAGEMENT SYSTEM”, which is a divisional of U.S. Ser. No. 16/251,586; filed Jan. 18, 2019, entitled, “AUTOMATED VEGETATION MANAGEMENT SYSTEM”, now U.S. Pat. No. 11,979,014, which is incorporated herein by reference in its entirety.

This Disclosure relates to vegetation management systems for protecting power lines of electric utilities.

Electricity distribution lines (power lines) used by electric utilities to deliver power to customers can become encumbered by vegetation overgrowth including branches of trees encroaching upon the safety corridor. Vegetation overgrowth including trees encroaching power lines is the leading cause of downed power lines during storms and other natural events. Power outages also can pose a public safety hazard such as when hospitals lack electrical power.

To combat this risk of vegetation-induced power outages, utilities or their contactors commonly prune trees, cut underbrush, and spray herbicides on the vegetation growing near their power lines. This vegetative management function is generally performed periodically, such as at a 1 to 10 year fixed interval.

This Summary is provided to introduce a brief selection of disclosed concepts in a simplified form that are further described below in the Detailed Description including the drawings provided. This Summary is not intended to limit the claimed subject matter's scope.

Disclosed aspects recognize with the use of analytics, specifically weather patterns, region specific vegetation growth models, and vegetative maintenance contractor capacity, a new more highly effective vegetative management system for power lines of an electric utility can be provided which can save the utility operational expense, and can also improve the safety and reliability of the electricity distribution. By combining vegetative growth prediction models with weather models, and visual imagery of the vegetation (e.g., trees) around the power lines such as obtained by at least one imaging system, a timing and place of future power line encroachment by the vegetation can be predicted so that vegetative maintenance can be implemented proactively to help avoid power outages.

Disclosed aspects include a vegetation management system comprising a computing system including a processor having an associated memory that is configured for implementing a vegetative modeler including an image analyzer and at least one 3-dimensional (3D) vegetation growth model. The vegetative modeler is for analyzing images of vegetation that is growing around electrical power lines of an electric utility including identifying locations of the vegetation relative to locations of the electrical power lines and to identify the specific types of the vegetation. The 3D vegetation growth model utilizes at least the locations of the vegetation relative to the locations of the electrical power lines and the specific types of the vegetation to generate a predicted timing of encroachment of the electrical power lines by the vegetation to identify future encroachment areas. A scheduler is for scheduling vegetative maintenance of the vegetation for the future encroachment areas.

Disclosed embodiments are described with reference to the attached figures, wherein like reference numerals, are used throughout the figures to designate similar or equivalent elements. The figures are not drawn to scale and they are provided merely to illustrate aspects disclosed herein. Several disclosed aspects are described below with reference to example applications for illustration. It should be understood that numerous specific details, relationships, and methods are set forth to provide a full understanding of the embodiments disclosed herein.

One having ordinary skill in the relevant art, however, will readily recognize that the disclosed embodiments can be practiced without one or more of the specific details or with other methods. In other instances, well-known structures or operations are not shown in detail to avoid obscuring aspects disclosed herein. Disclosed embodiments are not limited by the illustrated ordering of acts or events, as some acts may occur in different orders and/or concurrently with other acts or events. Furthermore, not all illustrated acts or events are required to implement a methodology in accordance with this Disclosure.

Disclosed aspects include an automated vegetation management system for power lines of an electric utility that combines utility asset inspections through visual imagery of the vegetation around the power lines, and an analytics engine to schedule vegetation management vendors and view budgetary spending on vegetation management. One significant technical benefit provided by Disclosed aspects is a full service area visual mapping of the power lines of an electric utility and the prediction of vegetation encumbrances of the power lines that can affect the reliability of electricity distribution. It is estimated that disclosed vegetation management systems can reduce the utility's operation expense up to about ⅓ of its overall operations budget.

is block diagram representation of an example vegetation management systemthat shows the system accessing cloud systemhosted components generally including a cloud serverthat implements a data lake layershown including satellite image datafor the visual imagery, as well as optionally other visual imagery obtained from an imaging systemsuch as UAV imaging, and an analytic model layer. A vegetation management computing systemis shown within the premises of an electric utilitythat includes a processorhaving a memory. The data lake layerand an analytic model layerboth provide a variety of inputs to the vegetative management computing system. The processorcan comprise a digital signal processor (DSP), a microcontroller, an application specific integrated circuit (ASIC), a general processor, or any other combination of one or more integrated processing devices.

The vegetation management computing systemimplements a vegetative modelerincluding an image analyzer and at least one 3-dimensional (3D) vegetation growth model for analyzing images of vegetation that is growing around electrical power lines of the electric utilityincluding identifying locations of the vegetation relative to locations of the electrical power lines and to identify specific types of the vegetation. The vegetative modelerincludes regional models and 3D vegetation growth prediction models for the vegetation that utilizes weather models which are provided by prediction modelsincluding weather prediction models as described below. Regional as used herein refers to geographical boundaries within a utility's service area weather.

The 3D vegetation growth model utilizes at least the locations of the vegetation relative to the locations of the electrical power lines and the specific types of the vegetation to generate a predicted timing of encroachment of the electrical power lines by the vegetation to identify future encroachment areas. Identification of the specific types of vegetation can be used to indicate the types of maintenance that should be performed, for example ash trees in North Carolina can be infected with a pest that weakens the structure of the tree which makes it more susceptible to breaking or falling.

The vegetative management computing systemalso implements s a scheduler. The data utilized by the schedulercan be viewed in the context of the utility's asset network. Vegetation maintenance prioritization can be ranked in terms of priority for the deemed most critical customers (e.g., hospitals, public safety and governmental offices) served and the number customers associated with specific distribution paths. The schedulercan rank relative outage impacts based upon the node structure of the circuit upon which the vegetation may impact.

The vegetative management computing systemalso implements a reconciler/auditor shown as a reconcilerthat keeps track of work performed at a specific region corresponding to a utility's cost center within a specific time period. This can create efficiency metrics per contractor to assist an electric utilityin procuring future services.

The data lake layeris shown including regional vegetation identification data, satellite images data, current weather condition data, historical weather pattern data, property tax assessor data, and land parcel ownership and easement data. The analytic model layeris shown including eco-informatics models, scoring engine models, acro sensor models, and prediction modelsthat includes weather prediction models as described above. Historical weather pattern datais a data source for the weather prediction models.

The data lake layeris a secure environment where streaming data, historical data, and periodically refreshed data is controlled and administrated. This data and/or data connection environment (e.g., utilizing application programming interface (API) calls) is typically procured from a third party. Regional vegetation identification dataprovides a list of vegetation commonly found in each specific geographic location. As described above, regional refers to geographical boundaries within a utility's service area that the vegetative modeleruses. The regional vegetation identification datamay include a list of diseases or pests that affect respective vegetation species.

Satellite image datais used for identification of areas of interest from storms or acts of nature. Satellite progression imagery is used to validate the growth predictions. Current weather condition datais used for assessing the relative priority of vegetation maintenance. For example, if high winds or temperatures fostering frozen precipitation are occurring, it may reprioritize jobs in process. Historical weather pattern datais used for climate considerations predictive growth analytics. Annual property tax assessor dataprovides the legal ownership of a plot of land and casements. Land parcel ownership and easement dataincludes deed purchase/sale data that shows new ownership of plots of land.

The electric utilityis also shown including a work order management system, an outage management system, and an asset management systemthat are all known systems for an electric utility. These systems,,all provide inputs to and/or outputs from the vegetative management computing system. The work order management systemis for electric utilities who use their own resource labor, where the work order management systemaccepts inputs from the vegetation management systemto schedule internal work order “tickets”, and the work order management systemsends data to the vegetation management systemsuch as a high priority work assignment, such as due to a recent downed tree on a power line that was observed from image data. The outage management systemis for all electric utilities, where the outage management systemcan send high priority data to the vegetation management computing system's 110 meter IDs, transformer IDs along a circuit(s) indicating there is a sustained outage along an electricity distribution asset segment. The data from the outage management systemsupports re-prioritization of jobs and can alert a contractor on-call to investigate and correct vegetation issues if it is found to be the cause of the power disruption. The asset management systemcan send distribution network attributes to the vegetation management computing systemsuch as geolocation coordinates (e.g., latitude, longitude, height/altitude), the date installed, maintenance dates, the reason, and if a given asset is on private property, or on state or federally protected land.

Vegetation maintenance control contractors shown for simplicity as contactorsand contactorare shown incommunicably coupled (e.g., by a mobile application for field applications and a secure Internet connection for the bidding process) to the electric utilityfor accessing information including the predicted timing and predicted places of vegetative encroachment of the electrical power line data. The contractors can then place bids, and the schedulercan utilize the contractor's bids to generate the scheduling of the vegetation control contactors. Disclosed vegetation encroachment predictions can thus be used by a scheduling application run by the schedulerthat schedules the vegetative maintenance and obtains contactor bids for specific vegetative maintenance work which enables the electric utilityto reduce vegetation management expenses. A mobile application shown as utility mobilethat is communicably coupled to the electric utilitycan allow the electric utilityto verify the vegetation maintenance work has been performed. A data review allows for a cost assessment per contractor.

depict an example vegetation encroachment analysis, such as utilizing a hyperspectral analysis with LIDAR analytics.shows an array of scanned images that are generally indexed using their corresponding time and location.shows a scanned output from the 3D vegetation growth model showing the resulting photogrammetry from the images in.shows a sample scanned output for vegetation encroachment detection obtained from the 3D vegetation growth model data processing. The vegetation encroachment analysis is provided first by a disclosed imaging systemproviding image data to the vegetation modelerfor identification of the specific region corresponding to the electrical utility'scost center using a plurality of the geo-coordinates tagged, assets (e.g., utility pole, power line), vegetation type(s) identified, camera angle and position, and current encroachment points identified from the image data.

Some image data that is determined to have low relative value may be discarded and thus not analyzed. The specific region corresponding to the electrical utility'scan then be further joined to the analytic model layer'smodels (,,,) with the output from the analytic model layerfed back to the vegetation management computing system. The key data elements provided by the vegetation encroachment analysis are generally 1) vegetation identification, 2) measurements of the vegetation encroaching upon the corridor which is a government dictated area surrounding a distribution system asset, measuring above, below, left and right in which nothing should enter, 3) visual defects in the structural integrity of a distribution asset such as a crack in a pole, crossbar or assets affixed to a power pole such as a crack in a bell, and the 4) time/location the visual inspection occurred.

Disclosed vegetation management systems apply to the particular application of electrical power utilities, specifically to protecting their power lines from damage from encroaching vegetation such as trees. Disclosed automated vegetation management systems solve a specific technical problem rooted in the electric power utilities, that being how to utilize utility asset inspection data together with a model-based prediction of future encumbrances by the vegetation to schedule vegetation contactors and optionally view budgetary spending on vegetation management. Disclosed vegetation management systems can allow an electric utility to trace and quantify the impact of a power outage through the distribution system down to the electricity end consumer by categorizing geographic information system (GIS) distribution endpoints, and assessing the relative impact should a power outage occur.

A weighted prioritization can occur for areas to perform maintenance due to a projected outage impact. Additionally, distribution assets pertaining to critical infrastructure such as feeders to hospitals or public security entities can be factored in as being a high priority. A companion mobile application (e.g., the utility mobileshown in) can provide direct input of verification/audit that vegetation maintenance has occurred by a contractor and to provide a method in which to trigger emergency maintenance when a field siting elevates an area's priority to an imminent power disruption.

The vegetation management computing systemcan also provide legal documentation support for private entities to clear right of ways, and the reconciling of maintenance spending to budget and contracts to performance. The reconcileras described above can also keep track of work performed at a specific region corresponding to the electrical utility'scost center within a specific time period thereby creating efficiency metrics per contractor to assist the utility in procuring future services.

Components that can support a disclosed vegetation management systeminclude analysis of local native vegetation for service territory, analysis of local native vegetation growth patterns for service territory, analysis of historical weather for the service territory, a precipitation forecast for service territory, UAV video or LIDAR footage of distribution assets, satellite imagery of service territory, mobile laser footage of service territory, GIS location of distribution assets, vegetation identification from imagery, measurement capability from imagery, and shadow discernment capability which comprises the ability to filter out extraneous light or dark to firmly identify/detect objects from the imagery. Available data can include distribution asset GIS codes from the customer, UAV footage for same distribution assets (e.g., video and LiDAR), and weather data including the current and historical weather data, shown as current weather condition data, and historical weather pattern datainfrom an Internet of things (IoT) platform data lake, such as the data lakealso shown in.

An example workflow cycle can include the vegetation management systemidentifying needed actions, planning such actions, having the actions performed (e.g., tree trimming), auditing the actions to ensure 3party crews are in compliance with utility work contracts, updating the outstanding maintenance jobs in the work queue as successfully or unsuccessfully completed, and repeating the workflow by then again having the vegetation management systemidentifying needed actions. The visual imagery enables identifying the types of vegetation (e.g., types of trees, bushes and vines) and their proximity to line corridors of the power lines and other power distribution assets. Predictive analytics can be used to numerically score regions in order of the predicted time of vegetative encroachment which can indicate relative priority in performing maintenance around the locations of the electrical power lines areas regions and the types of equipment needed to perform maintenance.

The planned data is used by the schedulerto create bids for contractors and contracts for specific vegetation maintenance work and timeframe. Contractors can have visibility into the requirements from the electric utility. The utility mobileinallows the electric utilityto verify the vegetation maintenance work has been performed to satisfaction and remedy non-performance as needed. A data review allows for cost assessment per contractor. If the GIS coordinates of an asset are incorrect, the asset inventory can be updated per auditor's request, and allow for a periodic (e.g., daily) budget review. The Key Performance Indicators (KPIs) for the electric utility can also be budgeted price vs. actual cost per region, efficiency per contractor—over/under per contract, work completed year-to-date (YTD) by contractor, units per region, cost per region, and miles and cost YTD.

Disclosed embodiments of the invention are further illustrated by the following specific Examples, which should not be construed as limiting the scope or content of this Disclosure in any way.

As an example use case for a disclosed vegetation management system, a utility asset maintenance director at an electric utility generally needs to reduce the electric utility's operational expense by scheduling line walks, truck rolls and arborist, and vegetation crew engagements more efficiently. The solution acceptance criteria for an electric utility can include a scheduling system for vegetation management resources, internal resources, and external contracted resources including KPIs to illustrate effectiveness in cost reduction, and understand land parcel ownership and document encroachment for support in private entity maintenance requests.

shows an overall system aggregation view, showing contactor's views, regional utility manager's views, and utility director's views. The director's full budget view covers the respective regions shown by example as 3 regions. Each region can have one or more associated contractors. For an electric utility director who has responsibility for multiple regions/states/geographical entities, an aggregated view with associated monetary and efficiency KPI's are available. For a regional manager, a limited view of his or her responsible cost center is provided. A contractor generally has visibility into his company's efficiency metrics and KPI's only.

In one specific scenario, regarding the square footage that vegetative encroachment corrective work completed and the year to date (YTD) money spent, ABC Contractor 1,000 out of 250,000 sq. ft, DEF Contractor 0 out of 500,000 square (sq) foot (ft), GHI Contractor 99,000 out of 100,000 sq ft, and the total as of Jun. 30, 2018 completed shown as 100,000 out of 850,000 sq ft. The contracts awarded and completed can comprise ABC Contractor, Region 1, $200,000, Jun. 30, 2018, DEF Contractor, Region 2 $300,000, Jun. 30, 2017, GHI Contractor, Region 3 $400,000, Mar. 31, 2018. Understanding the region area and type of equipment needed for the vegetative management services allows for a more competitive contactor bidding process for the electric utility.

While various disclosed embodiments have been described above, it should be understood that they have been presented by way of example only, and not as a limitation. Numerous changes to the disclosed embodiments can be made in accordance with the Disclosure herein without departing from the spirit or scope of this Disclosure. Thus, the breadth and scope of this Disclosure should not be limited by any of the above-described embodiments. Rather, the scope of this Disclosure should be defined in accordance with the following claims and their equivalents.

Patent Metadata

Filing Date

Unknown

Publication Date

October 9, 2025

Inventors

Unknown

Want to explore more patents?

Browse 5M+ US patents with plain-English claim translations and AI-generated analysis.

Citation & reuse

Analysis on this page is generated by Patentable — an AI-powered patent intelligence platform. AI-generated summaries, explanations, and analysis may be reused with attribution and a visible link back to the canonical URL below. Patent abstracts and claims are USPTO public domain.

Cite as: Patentable. “AUTOMATED VEGETATION MANAGEMENT SYSTEM” (US-20250316969-A1). https://patentable.app/patents/US-20250316969-A1

© 2026 Patentable. All rights reserved.

Patentable is a research and drafting-assistant tool, not a law firm, and does not provide legal advice. Documents we generate are drafts for review by a licensed patent attorney.

AUTOMATED VEGETATION MANAGEMENT SYSTEM | Patentable